Contact
Get it checkedDE/EN
Independent building advisory

You are buying, building or renovating.
I check it before you pay.

At home or abroad. Land, an off-plan build or an existing house. Within 48 hours you know whether your project holds up.

750 EUR
Flat fee, no hidden costs.
48 hours
From documents received to report.
Buyer-paid
Never from the selling side.
750 EUR flat · result within 48 hours · worldwide
Benjamin Fercher
Where do you stand right now?

Three situations. Three routes.

Pick the line that applies to you. Behind it sits exactly what needs checking in that situation.

01

I have a listing and I am expected to sign soon

Price, substance, permits and contract before any money moves. This is the standard case and the moment a check is worth the most.

See the property check
02

I am buying off-plan and the next instalment is due

Payment plan against construction progress, specification, completion security. Before the transfer, not after.

Have the developer checked
03

I am looking at an old house and do not know what the renovation costs

Structure, damp, roof, building services and a realistic renovation depth based on photos and drawings.

Have the existing house checked
What you do not see

The most expensive problems are the invisible ones.

Each of these can cost five figures. None of them shows up on a viewing with an agent and good weather.

×Damp in the masonry, invisible from outside. Repair from 25,000 EUR
×Wall build-ups unsuited to the local climate. Mould within three years, full renovation from 40,000 EUR
×Missing or forged building permits. Officially the house does not exist, risk of demolition
×Structural defects. Cracks that cannot be repaired, only covered. Loss in value of 30 to 50 percent
×Unrealistic renovation costs. You budget 30,000 and end up at 120,000
×A developer without substance. Nice website, no land, no permit. Deposit gone.
The offer

One product. Three variants. 750 EUR.

Whether land, a developer project or an existing house: within 48 hours you get a structured report with a traffic-light rating and a clear recommendation. Buy, renegotiate or walk away.

Land

750 €

Title, development rights, services, location and price. At home and abroad.

Details

Developer and off-plan

750 €

Developer reputation, specification, payment plan and permits. Does the promise hold up technically?

Details

Existing house

750 €

Structure, materials and services from photos and drawings, plus a realistic renovation depth.

Details

Healthy Home Audit · 1.500 EUR

Not the property but your health inside it: air, mould, pollutants, materials, radon. With a traffic light and an action plan, for existing buildings and new builds.

To the Healthy Home Audit

What clients say

Four out of many.

★★★★★

Benjamin Fercher comes highly recommended. He gave me a precise and understandable analysis of the property in question, and precise advice on what to do to remove the defects. And what counts a lot: this is not someone who just takes the client's money and delivers something cheap, but someone who does his job with judgement, deep expertise and real care.

Berthold K.
Google
★★★★★

I would advise anyone buying a property to get Benjamin's opinion. Absolutely excellent and deep analysis of the structural risks and the legal background. In my view the investment in Benjamin saves a lot of unnecessary extra cost later.

Sören S.
Google

All reviews on Google

How it works

From enquiry to result in 48 hours.

01

Enquiry

You send me an email with the property and the documents you have.

02

Document check

I check whether everything is there. If something is missing, I tell you what you still need.

03

Report

Within 48 hours you get your traffic-light report with a clear recommendation.

04

Invoice

The invoice of 750 EUR follows after delivery.

What the check is not

No site visit. No structural recalculation. No legal advice. No dealings with authorities. The check is a founded risk assessment based on the available documents and 15 years of building projects, not a substitute for a local lawyer or surveyor. If you need both, the report says so.

The method

Seven levels. One clear verdict.

Every check follows the same grid, from completeness of documents to the traffic light. That makes visible what stays invisible on a viewing.

01

Documents

Completeness check, first risk indicators.

02

Title and law

Title, land register, development law, country-specific risks.

03

Developer and contract

Reputation, payment plan, bank guarantees, snagging clauses.

04

Substance

Structure, damp, roof, facade. And plausibility: the listing against the objective finding.

05

Climate and material

Site suitability, building physics, breathable build-ups, regional material choice.

06

Economics

Follow-up costs over 5 and 10 years, renovation forecast, resale prospects.

07

Recommendation

Traffic light GO, CONDITIONAL or NO-GO with reasons. Plus concrete levers for renegotiation.

Sample report

This is what a finished report looks like.

Not a loose PDF with a few phrases but a structured document of 9 to 13 pages: traffic-light overview per check point, detailed analysis, a counter-calculation of the yield, a location profile and a clear recommendation at the end. Three real, anonymised pages from a delivered report on an off-plan project in Bulgaria.

Why me

Independent, because nobody else pays me.

Agents, developers, architects, trades: all of them earn on your build. I am the only one at the table who does not. My business model is that you pay me for the judgement.

No commissions

I take no money from agents, developers or sellers.

No supplier ties

I recommend materials by suitability, not by sponsorship.

No developer partnerships

I check projects, I do not sell them.

No material sales

I do not trade building materials and earn nothing on your order.

Core markets

Where I check most often.

These markets have their own pages with the local specifics: registers, permit routes, typical construction and the mistakes that keep happening there.

Browse the developer index

The index records, for 59 developers and 305 projects across ten countries, what is publicly documented and what is not. No score, no traffic light, every entry with its source.

Your country is not listed? It still gets checked. Building physics and contract risk follow the same principles everywhere, and I research the specifics for your location.

Insights

What I see in the cases.

All insights

Published in Manova magazine

The disposable shell.

Clay houses from the 18th century are still standing. Developer blocks from the 1980s are being torn down. Modern building substance is no longer planned for generations but for thirty to fifty years, and that is not an oversight but a business model.

The question I ask owners and buyers is simple: what is your house made of, and how will it age? The answer is not in the marketing material, not in the specification and not in the contract.

Manova-Magazin · 03.07.2026

Read the full article

Longevity construction

The check tells you whether someone else's house lasts. Longevity is how I build myself.

Not a wellness promise but building physics: sound substance for 50 years and more, clean air, good daylight, honest materials of clay, lime, timber and stone, and real self-sufficiency in energy and water.

Substance

Structure and damp protection for 50 years and more. A house that lasts, without expensive repairs.

Air

Breathable build-ups without VOCs and synthetics. Clean indoor air, better sleep.

Light

Daylight and orientation following the course of the day. An alert day, a calm evening.

Material

Clay, lime, timber and stone instead of composites. No off-gassing, healthy surfaces.

Self-sufficiency

Energy, water, sound, indoor climate. Low running costs and quiet.

More on longevity construction

Services and prices

From the quick check to the finished house.

The entry point is always the check. Whoever builds goes on from there.

Check

Property check

Remote check of documents, location and developer. Land, off-plan or existing house.

Details
750 EUR · 48 h
Check

Healthy Home Audit

Air, mould, pollutants, materials, radon. With traffic light and action plan.

Details
750 EUR
On site

On-site inspection

Personal inspection with photo documentation and a detailed report.

Discuss a date
1,500 EUR + travel
Longevity

Longevity curation

Full curation of a building project on longevity principles: materials, layout, climate, substance.

Details
4,500 to 7,500 EUR
Longevity

Longevity site supervision

Ongoing supervision across the whole build, with personal presence on site.

Discuss the project
from 3,500 EUR / month
Mandate

Terra Privée premium mandates

A curated network of natural retreats. Confidential, by personal referral.

terraprivee.com
On request
For law firms and advisers

The technical check your mandate is missing.

Tax advisers, lawyers, relocation consultants: your clients buy property abroad. You cover law and tax, nobody checks the building. I supply the finding and the traffic light, you stay the point of contact.

Fixed terms

Flat fees and 48-hour delivery, predictable for your workflow.

Full independence

No commissions from the selling side, no developer ties. Your client gets a judgement, not a sales argument.

Partner model

Ongoing cooperation on fair partner terms. Details in a call.

Discuss a partnership office@benjaminfercher.at

Who checks

Benjamin Fercher

Master builder and civil engineer from Austria. 15 years on sites, in design offices and in independent advisory, more than 120 million euros of project volume. I have built houses from timber, clay and stone, and I have seen projects fail on the wrong materials, over-complex technology and missing control.

My approach: substance before technology, building physics before gadgets. Breathable, climate-appropriate construction instead of over-engineered systems that need servicing after five years and are electronic waste after ten.

Core markets: Austria, Portugal, Cyprus, Spain, Italy, Greece, Thailand, Namibia, the Philippines. And anywhere else you want to buy or build.

Benjamin Fercher
Free guide

Global Real Estate Intelligence

31 pages of plain talk: the most common mistakes when buying property abroad, checklists, traffic-light system and a risk matrix by country. The guide my clients get before they book me.

Global Real Estate Intelligence
Frequently asked

Before you ask.

The check is my front door, not my core business. I want as many people as possible to have a solid basis before they buy. Whoever needs more afterwards gets it. Whoever does not still has a judgement.
An AI tool gives you information. I give you a judgement. The difference costs 750 EUR or 50,000 EUR, depending on when you ask. A model does not know your developer, has never been on a site in that region and carries no responsibility.
The check is based on the documents you send: drawings, photos, contracts, land register. On top of that comes my own research on location, developer and market. Whatever I cannot judge from a distance is listed as an open point in the report.
Yes. Building physics, material logic and contract risk follow the same principles everywhere. What differs are registers, permit procedures and climate, and that is exactly what I research for the specific location.
No. If you know what you want, send me an email with the documents. The call is for people who are unsure whether the check fits their situation.
Then you invested 750 EUR instead of 200,000 EUR. That is the point of the check. The report gives the concrete reasons. Sometimes there is room to renegotiate, sometimes the answer is to walk away.
That depends on the substance, not on the appearance. A house can look run down and still have a good basis. And a house can look freshly renovated and be a wreck underneath.
Houses that last 50 years and more and keep you healthy while they do. Sound structure, clean indoor air, good daylight, honest materials such as clay, lime, timber and stone, and real self-sufficiency in energy and water.
Sometimes slightly during construction, over the lifespan almost always cheaper. Breathable build-ups and solid materials save follow-up costs because there is less technology to service and less to repair.
Yes. From curating a project on longevity principles to ongoing site supervision with personal presence. What makes sense in your case we settle in a call.
Contact

You have a property. Send me the documents.

One email with the listing, the location and the documents you have. I come back within 24 hours on whether everything is there. 48 hours after that you have your report.

Get your property checked 10-minute intro call

office@benjaminfercher.at · +43 664 40 38 013

The Buyer’s Side

One piece a week, on the buyer’s side of property abroad

What goes wrong in cross-border purchases, how to check it before you sign, and what my own database of evidenced developments shows about this industry. Every claim with a source and a retrieval date.